Taihui Blow Molding Machine Electrical Installation Instructions

First, the installation of electrical components pay attention to these parts: the device installation of the distribution board, the installation of the solenoid valve, the installation of the sensor.


1. Main components of the switchboard installation: installation of PLC, power supply, circuit breaker, relay, amplifier board, thyristor, terminal block insurance seat, etc. How much is installed depends on the circuit diagram.


2. Installation of the solenoid valve Note that the output of the blowing part is short and the reaction is fast. The bottle and the upper embryo are not required.


3, sensor installation attention to the difference between the front and rear limits of the cylinder


Second, the installation of circuit gas path


   1. The basic principle of circuit installation is that the current is from left to right. From top to bottom, the large current and the small current should be separated as far as possible; the communication line must be separated from the power line; some parts cannot be separated, and the communication line must use the shielded line.


2. During the installation process, pay attention to the movement of the movement, reserve enough lines and air pipes to avoid the wire or air tube being broken and pulled too tight during the movement, and the equipment can not operate.


3. During the circuit installation process, the terminals should be pressed tightly, and each time the pressure is pressed, the hand should be checked to see if it is pressed firmly.


4. Pay attention to what type of PLC is used, what type of input is, and what type of output. The Delta PLC we are currently using is low level input and low level output. The Mitsubishi PLC FX3U series is the same.


5. The amplifier board we use is input low level and output high level.


6. According to our PLC type, the sensor we are currently using is an NPN sensor.


7, the choice of wire size (tail attached formula).


Third, the circuit installation steps:


a. Verify the specific actions of the device, which parts have been added or subtracted


b. Change the program according to the result, circuit diagram, electrical list, instruction manual, I/O comparison table, etc.


c. According to the electrical list, go to the warehouse to register and collect electrical parts. If it is missing, register immediately to purchase.


d. Separate the collected electrical components, separate the switchboard mounting components, solenoid valves, sensors, buttons and touch screens, and communication lines.


e, the sensor can be put on the number tube, the solenoid valve air blow muffler can be installed first, the touch screen button panel installation, the power distribution board can also be typeset and installed wiring, the bottle embryo sensor and the bottle abnormal sensor fixed frame You can prepare and prepare for the next installation.


f. When the rack is assembled, the alarm light, switchboard, solenoid valve, line trunking (or fixed seat), etc. can be installed to connect the circuit of the solenoid valve, sensor, etc. back to the electrical box.


g. After the installation of the main circuit of the equipment (referring to the blowing part of the blowing bottle), the machine can be powered on and the program and screen can be written. First check if the circuit is short-circuited, whether the wire head screw is installed firmly, etc., and then power on the test machine after no problem.


 


 


The relationship between the current carrying capacity of the aluminum core insulated wire and the cross section

                10 to 5, 100 to 2,

                25, 35, four, three worlds,

                70, 95, two and a half.

              Pipe, temperature, eight or nine fold.

                  Add half of the bare wire.

                  Copper wire upgrade count.


. 口: The current per KW of the low voltage 380/220 volt system, safety.

 Kilowatt, current, how to calculate?

 The power is doubled and the electric heat is added half.

Single phase kilowatts, 4.5 amps.

Single phase 380, current two and a half.



主站蜘蛛池模板: 欧美激情精品久久久久久久 | 欧美日韩亚洲国产一区二区三区 | 亚洲一区二区黄色 | 他添的我好湿好爽视频 | 欧美日韩欧美 | 亚洲国产第一区二区三区 | 欧美亚洲国产精品久久第一页 | 高清一区二区三区 | free性欧美极度另类性性欧美 | 国产成人精品综合久久久 | 麻豆看片| 国产乱码一区二区三区四区 | 国产国产成人精品久久 | 国产精品爱久久久久久久 | 一本到亚洲网 | 中文字幕7| 亚洲成人影院在线观看 | 在线精品自拍亚洲第一区 | 欧美福利视频在线 | aa级毛片| 亚洲免费福利视频 | 一区二区三区在线观看视频 | 五月婷婷免费视频 | www.日本高清视频.com | 国产欧美日韩免费 | 亚洲精品毛片久久久久久久 | 欧美精品人爱a欧美精品 | 男女爽爽无遮挡午夜视频在线观看 | 欧美黑人性生活 | 亚洲福利社 | 中文字幕最新在线 | 中文字幕2021 | 日本欧美在线观看 | a毛片全部播放免费视频完整18 | 久久国产精品-久久精品 | 五月天福利 | 国产美女亚洲精品久久久综合91 | 一级爱爱| 欧美性videos高清另类hd | 国产精品久久久久久久久免费 | 黑人性受xxxx黑人xyx性爽 |